Macinnes Bros Extended Logo
Macinnes Bros Short Logo (2019 Update)
  • About
    • About MIB
    • Our Culture
    • Health and Safety
    • Quality and Environmental
    • Work With MIB
    • MIB Community Impact
    • Latest MIB News
  • MIB Construction
  • MIB Civil Engineering
  • Builders Merchant
    • MIB Merchants
    • Aggregate
    • Concrete
    • Waste Transfer Station
    • Construction Plant Hire
    • MIB Haulage
  • MIB Homes
  • Contact
Menu
  • About
    • About MIB
    • Our Culture
    • Health and Safety
    • Quality and Environmental
    • Work With MIB
    • MIB Community Impact
    • Latest MIB News
  • MIB Construction
  • MIB Civil Engineering
  • Builders Merchant
    • MIB Merchants
    • Aggregate
    • Concrete
    • Waste Transfer Station
    • Construction Plant Hire
    • MIB Haulage
  • MIB Homes
  • Contact

Waste Transfer Station

  • MIB Merchants
  • Aggregate
  • Concrete
  • Waste Transfer Station
  • Construction Plant Hire
  • MIB Haulage
Menu
  • MIB Merchants
  • Aggregate
  • Concrete
  • Waste Transfer Station
  • Construction Plant Hire
  • MIB Haulage
Responsible Processing of Commercial Waste

MacInnes Bros Ltd strive to minimise our construction activities with a positive view to reducing the work-related impact on the environment and waste accumulation/disposal, protecting natural resources and ensuring they are passed onto future generations in good order.

Our Uachdar, Benbecula Depot is a Scottish Environmental Protection Agency registered Waste Management holder (Licence No: WML/N/0220019) and Waste Carrier (Registration No: SNO/038046).

MIB strive to minimise our Construction Waste by using SEPA guidance – SWMPs and Pollution Prevention Guideline 6, Section 10 – whilst working at construction and demolition sites:

  • Identifying the quantities and types of waste that are likely to be produced, assessing potential opportunities for re-use or recycling where possible
  • Identifying how each type of waste/refuse should may be dealt with, including segregation and conveyance by covered skips to our registered Disposal Depot on Benbecula
  • Progressively monitor the ordering and delivery of materials, preventing excess, reducing storage and waste
  • Promulgate all Site Waste Management arrangements to site staff & contractors on a regular basis, evidencing discussions in relevant Site Waste Management Plan
  • Separating different types of waste/refuse into separate skips as required
  • Covering skips/receptacles to prevent waste/refuse being scattered by the weather, or wildlife into the local environment
  • Removing all nails from scrap timber to avoid hand/foot injuries being sustained by employees
  • Securing lightweight waste/refuse to prevent it being scattered by the wind into the local environment
  • Ensuring waste/refuse is placed in correctly marked skip/receptacle
Purple Rgb Accredited
Achilles Qualified
Achilles Audited
Silver Rgb
Lw Logo Employer Rgb
Macinnes Bros Short Logo (2019 Update)

MacInnes Brothers

  • About Us
  • Work With MIB
  • Contact Us
  • Privacy Policy

Contacts

  • Uachdar, Isle of Benbecula,
    Western Isles, HS7 5LY
  • info@macinnesbros.com
  • 01870 602910
Twitter
Facebook-f
Macinnes Bros Shield Crest

Copyright © 2019 MacInnes Bros Ltd. All rights reserved

Responsive Website Design and Development by mtc.