Macinnes Bros Logo (2025)
Macinnes Bros Short Logo (2019 Update)
  • About
    • About MIB
    • MIB Culture & Policies
    • Health and Safety
    • Quality and Environmental
    • Work With MIB
    • MIB Community Impact
    • Latest MIB News
  • MIB Construction
  • MIB Civil Engineering
  • Builders Merchant
    • MIB Merchant
    • Aggregate
    • Concrete
    • Waste Transfer Station
    • Construction Plant Hire
    • MIB Haulage
  • MIB Homes
  • Contact
  • About
    • About MIB
    • MIB Culture & Policies
    • Health and Safety
    • Quality and Environmental
    • Work With MIB
    • MIB Community Impact
    • Latest MIB News
  • MIB Construction
  • MIB Civil Engineering
  • Builders Merchant
    • MIB Merchant
    • Aggregate
    • Concrete
    • Waste Transfer Station
    • Construction Plant Hire
    • MIB Haulage
  • MIB Homes
  • Contact

FS21 West Camp Accommodation & Civils

  • Civil Engineering, Construction

Principal Contractor

  • QinetiQ Ltd
  • 11 months
  • NEC3 Contract Conditions

West Camp, Benbecula — Civil Works for QinetiQ

MacInnes Bros Ltd were appointed as Principal Contractor to deliver strategically critical civil works on the site of the former hockey pitch at the West Camp military site, preparing the ground for temporary accommodation as required by QinetiQ.

The works met the following key client targets:

  • Provision of new services, and diversion of existing services, for temporary cabins and modular buildings
  • Provision of hardstandings and foundations for cabins and modular buildings
  • Connection of cabins and modular buildings to site infrastructure (MIB also successfully tendered for the transportation of 150 cabins in FS21, and a further 100 cabins in FS23)

The excavation and concreting works were carried out directly adjacent to HIAL Benbecula Airport, requiring a high standard of Foreign Object Debris (FOD) management and dust control to avoid any disruption to airport operations. MIB drew on its strong relationship with airport staff and Air Traffic Control — built up over more than 25 years as the Term Contractor at the site — to share daily updates on site activity with HIAL, with strict site housekeeping ensuring FOD risk was eliminated.

Risk management and detailed pre-planning were vital to the contract’s success, given the stringent MOD timetable: sectional completion dates were fixed, with significant penalties for delay.

  • Architect: Designers - BakerHicks
Dscn1188
Dsc00275
Dsc00410
Dsc00749
Purple Rgb Accredited
Achilles Uvdb Stamp Silver Plus
Achilles Uvdb Stamp Verified
Silver Rgb
Lw Logo Employer Rgb
Familyaward2021logo Business Gateway Winner
Macinnes Bros Short Logo (2019 Update)

MacInnes Brothers Ltd

  • About Us
  • Work With MIB
  • Contact Us
  • Privacy Policy

Contacts

  • Uachdar, Isle of Benbecula,
    Western Isles, HS7 5LY
  • info@macinnesbros.com
  • 01870 602910
TwitterFacebook-f
Macinnes Bros Shield Crest

Copyright © 2019 MacInnes Bros Ltd. All rights reserved

Responsive Website Design and Development by mtc.