FS27 Preparatory Works — West Camp, QinetiQ
The works comprised:
- Provision of additional services for temporary cabins and modular buildings, as required
- Delivery and unloading of modular buildings to site
- Connection of cabins and modular buildings (provided by others) to site infrastructure
- Drain cleaning and flushing of the existing water main network in preparation for FS27 water supply
- Testing of the existing electrical network, and supply of hardwiring disruption boards
- Testing of the existing data network
- Connection of communal buildings to existing data, power, water, and foul sewer networks