Loch na Obe Causeway Replacement, Isle of Barra
Works included the construction of approach embankments and the installation of precast culvert units and wingwalls, replacing an existing single-track road causeway at Loch na Obe, Isle of Barra, that had deteriorated to the point where its supporting walls and bridge structure were considered beyond serviceable condition.

