Macinnes Bros Logo (2025)
Macinnes Bros Short Logo (2019 Update)
  • About
    • About MIB
    • MIB Culture & Policies
    • Health and Safety
    • Quality and Environmental
    • Work With MIB
    • MIB Community Impact
    • Latest MIB News
  • MIB Construction
  • MIB Civil Engineering
  • Builders Merchant
    • MIB Merchant
    • Aggregate
    • Concrete
    • Waste Transfer Station
    • Construction Plant Hire
    • MIB Haulage
  • MIB Homes
  • Contact
  • About
    • About MIB
    • MIB Culture & Policies
    • Health and Safety
    • Quality and Environmental
    • Work With MIB
    • MIB Community Impact
    • Latest MIB News
  • MIB Construction
  • MIB Civil Engineering
  • Builders Merchant
    • MIB Merchant
    • Aggregate
    • Concrete
    • Waste Transfer Station
    • Construction Plant Hire
    • MIB Haulage
  • MIB Homes
  • Contact

Loch na Obe Culvert Replacement

  • Civil Engineering

Principal Contractor

  • CnES
  • 8 months
  • NEC3 Contract Conditions

Loch na Obe Causeway Replacement, Isle of Barra

Works included the construction of approach embankments and the installation of precast culvert units and wingwalls, replacing an existing single-track road causeway at Loch na Obe, Isle of Barra, that had deteriorated to the point where its supporting walls and bridge structure were considered beyond serviceable condition.

  • Architect: Designers/Engineers - CnES
Img 20240708 Wa0004
Img 20240918 Wa0023
Purple Rgb Accredited
Achilles Uvdb Stamp Silver Plus
Achilles Uvdb Stamp Verified
Silver Rgb
Lw Logo Employer Rgb
Familyaward2021logo Business Gateway Winner
Macinnes Bros Short Logo (2019 Update)

MacInnes Brothers Ltd

  • About Us
  • Work With MIB
  • Contact Us
  • Privacy Policy

Contacts

  • Uachdar, Isle of Benbecula,
    Western Isles, HS7 5LY
  • info@macinnesbros.com
  • 01870 602910
TwitterFacebook-f
Macinnes Bros Shield Crest

Copyright © 2019 MacInnes Bros Ltd. All rights reserved

Responsive Website Design and Development by mtc.