Macinnes Bros Extended Logo
Macinnes Bros Short Logo (2019 Update)
  • About
    • About MIB
    • MIB Culture & Policies
    • Health and Safety
    • Quality and Environmental
    • Work With MIB
    • MIB Community Impact
    • Latest MIB News
  • MIB Construction
  • MIB Civil Engineering
  • Builders Merchant
    • MIB Merchants
    • Aggregate
    • Concrete
    • Waste Transfer Station
    • Construction Plant Hire
    • MIB Haulage
  • MIB Homes
  • Contact
Menu
  • About
    • About MIB
    • MIB Culture & Policies
    • Health and Safety
    • Quality and Environmental
    • Work With MIB
    • MIB Community Impact
    • Latest MIB News
  • MIB Construction
  • MIB Civil Engineering
  • Builders Merchant
    • MIB Merchants
    • Aggregate
    • Concrete
    • Waste Transfer Station
    • Construction Plant Hire
    • MIB Haulage
  • MIB Homes
  • Contact

Sgoil Uibhist a Tuath, North Uist

  • Construction

MIB Role: Main Subcontractor to Robertson Construction Ltd

  • Comhairle nan Eilean Siar (CNES)
  • Band A £7M - £10M
  • 58 Weeks
  • NEC3 Option A

MacInnes Bros Ltd were employed as the main subcontractor to Robertson Construction Ltd who were awarded the main contract for the construction of the new Primary School at Bayhead to serve the whole of North Uist.

The main scope of works were demolition, excavation works, blockwork and roughcast, drainage, hard landscaping works and all structural concrete within the build.

The school was constructed with a close relationship with the existing school staff and pupils. The sentimental connection with the existing school was greatly respected and understood by MIB and school pupils and staff were able to arrange site visits to the new schools throughout the whole construction so they could see the progression of their new school and workplace.

During construction MacInnes Bros were able to provide employment opportunities for local people: plant operators, HGV drivers, labourers and a site supervisor many of whom are still in our employment on other contracts.

In addition to sourcing staff locally, we actively sought to source materials from local suppliers. Aggregate and rock was sourced locally to ensure that the benefit of these orders were channelled to the local community rather than placing the orders with off island suppliers who had offered lower prices.

The contract was governed by the NEC Option A conditions and was completed on budget and on programme.

  • Architect: 3DReid Architects
  • Structural Engineer: Cundall Engineering
MIB Main Subcontractor - Sgoil Uibhist a' Tuadh
Dcim100media
North Uist School
Hyperfocal: 0
North Uist School Interior
Previous
Next
Purple Rgb Accredited
Achilles Uvdb Stamp Silver Plus
Achilles Uvdb Stamp Verified
Silver Rgb
Lw Logo Employer Rgb
Familyaward2021logo Business Gateway Winner
Macinnes Bros Short Logo (2019 Update)

MacInnes Brothers Ltd

  • About Us
  • Work With MIB
  • Contact Us
  • Privacy Policy

Contacts

  • Uachdar, Isle of Benbecula,
    Western Isles, HS7 5LY
  • info@macinnesbros.com
  • 01870 602910
TwitterFacebook-f
Macinnes Bros Shield Crest

Copyright © 2019 MacInnes Bros Ltd. All rights reserved

Responsive Website Design and Development by mtc.